Mounting on an existing foundation (top of foundation ±0) or, on paved ground, with a 20 cm post extension (top of foundation −20). Optionally, we supply a precast concrete foundation slab (slip resistance class R13, joint grid 300×300 mm), eliminating extensive foundation work. The foundation plan comes with the order confirmation.